top of page
RapidSetCementLogo_V2.0_10.png
Rapid Set ARM.png

THE

FAST &

DURABLE SOLUTION

FOR MULTIPLE REQUIREMENTS

Linien_bearbeitet-1.png
Multi-Reparaturmörtel

CEMENT ALL

MULTIPURPOSE REPAIR MORTAR

®

Mutli-Reparaturmörtel

LAYER THICKNESS 

Cement All
Mutli-Reparaturmörtel
Mutli-Reparaturmörtel

Floor repair

Industrial grouting

Mutli-Reparaturmörtel

Anchoring

Mutli-Reparaturmörtel

Concrete repair

Mutli-Reparaturmörtel

Casting

2

READY FOR TRAFFIC 

Rock solid in 1 hour
After 60 minutes > 20,0 N/mm

READY  TO COVER 

Vapor-permeable coverings after ca. 2 hours

Vapor-proof coverings after ca. 16 hours

INITIAL SET

In 15 minutes. Extend working time by using SET Control or very cold water

CONSISTENCY 

From stiff to flowable - Water dosage from 3,0 to 4,75 l

EXTREME BOND 

On properly prepared sub-base

No primer

MORTAR MIX

FAST SETTING REPAIR MORTAR

Linien_bearbeitet-1.png
Schnellmörtel
Diagramm braun Kopie.png

 LAYER THICKNESS

Mortar Mix
Schnellmörtel

Stucco repair

Schnellmörtel

Concrete repair

Schnellmörtel

Wall repair

  READY FOR TRAFFIC

Rock solid in 1 hour
After 60 minutes > 17,0 N/mm

 

 READY  TO COVER 

Vapor-permeable coverings after ca. 2 hours

Vapor-proof coverings after ca. 16 hours

INITIAL SET

In 15 minutes. Extend working time by using

SET Control or very cold water

 

CONSISTENCY

From stiff to flowable
Water dosage from 3,0 to 4,5 l

 

EXTREME BOND

On properly prepared sub-base

No primer

2

Linien_bearbeitet-1.png

CONCRETE MIX

VERY FAST SETTING CONCRETE

Schnellbeton
Schnellbeton

LAYER THICKNESS 

Concrete Mix
Schnellbeton

Formed concrete

Schnellbeton

Post setting

Schnellbeton

Concrete repair

READY FOR TRAFFIC 

Rock solid in 1 hour
After 60 minutes > 19,0 N/mm

READY  TO COVER 

Vapor-permeable coverings after ca. 2 hours

Vapor-proof coverings after ca. 16 hours

INITIAL SET 

In 15 minutes. Extend working time by using

SET Control or very cold water

CONSISTENCY

From stiff to flowable
Water dosage from 3,0 to 4,5 l

EXTREME BOND

On properly prepared sub-base

No primer

2

Level Flor

  SELF-LEVELLING/ FAST-SETTING 

ready for foot traffic in 3 – 4 hours 

  

◼ FAST FLOOR INSTALLATION  

moisture insensitive flooring 

e.g. tile may be placed in 6 hours 

  

◼ INSTALLATION THICKNESS

up to 120 mm 

  

◼ INDOORS AND OUTDORRS

in wet environments

Linien_bearbeitet-1.png
LevelFloor_Ausgleichsmasse.png

LEVEL FLOR

®

FAST-SETTING AND SELF-LEVELLING UNDERLAYMENT

For full  details, please  see our brochure.

bottom of page